Shared components
Savings with a wider view.
When does a cheaper component create a more expensive disruption?
Explore the potential purchasing savings and supply exposure of using one component across several product lines. Change the assumptions and compare three decisions.
Explore the walkthroughSharing components can reduce unit cost and simplify purchasing. It can also connect several product lines to the same supplier failure. Management needs to see both sides of that decision.
Component-sharing strategies prompted this example. It extends the decision-support approach I have used in engagements into an illustrative application for comparing options and explaining potential outcomes to management.
- Sourcing decisions
- 3 optionsSeparate, shared, or shared with a second supplier
- Interactive comparison
- Your assumptionsAdjust cost, demand, inventory, and recovery time
- Scenario results
- Potential outcomesIllustrative calculations, not achieved savings
01 / The approach
Make the trade-off explicit.
Keep assumptions visible and separate annual purchasing benefits from exposure in a disruption. Use the comparison to support a discussion rather than imply a single correct answer.
- 01
Set the baseline
Define product lines, demand, and current component costs.
- 02
Explore sharing
Set the assumed purchasing discount and examine the wider supplier exposure.
- 03
Test disruption
Compare inventory coverage with supplier recovery time.
- 04
Discuss the decision
Compare savings and mitigation costs, then identify what needs validation.
02 / Explore in practice
Compare cost and resilience scenarios.
Move the sliders, compare the options, and select a decision to see its implications for a management discussion.
This is a proposed application with fictional inputs and transparent assumptions. It is not a validated forecasting model, a record of achieved savings, or employer or client source data.
Change the assumptions. Compare the decisions.
One component per finished unit. Annual demand stays constant as you compare three sourcing options. All inputs and results are illustrative.
14-day inventory shortfall
Inventory runs out after day 21, leaving 14 days of demand without full supply.
Coverage balance: −14 days · 21 days of inventory − 35 days of disruption
Sharing the component saves USD 900,000 in annual purchasing costs. A primary supplier disruption exposes 6 product lines, compared with one line when components have independent suppliers.
Savings and disruption exposure
Annual savings and contribution at risk from one disruption are separate measures. This model does not assign an event probability or calculate expected annual loss.
Keep separate components
Each product line uses its own component and an independent supplier. A supplier disruption affects one line, while purchasing costs stay at the baseline.
Share one component
All selected product lines use one common component from one supplier. The assumed volume discount lowers unit cost, but a disruption can affect every line.
Share with a second supplier
All selected product lines use one common component, with orders split equally between two independent suppliers. If one fails, the other maintains its existing half of supply. This option includes a price premium and qualification cost.
| Decision | Annual purchasing cost | First-year savings | Lines exposed | Units at risk / disruption | Contribution at risk / disruption |
|---|---|---|---|---|---|
| Keep separate components | USD 6,000,000 | USD 0 | 1 | 767 | USD 23,014 |
| Share one component | USD 5,100,000 | USD 900,000 | 6 | 4,603 | USD 138,082 |
| Share with a second supplier | USD 5,227,500 | USD 747,500 | 6 | 2,301 | USD 69,041 |
Decision under discussion: Share one component. First-year savings are USD 900,000 relative to separate components; contribution at risk in the modeled disruption is USD 138,082.
The trade-off: The purchasing benefit comes with USD 115,068 more contribution at risk per modeled disruption than separate components.
Before committing: validate quotations, interchangeability, supplier independence, backup capacity, and inventory coverage with Procurement, Engineering, Finance, and Operations. Agree an owner and review date for the selected option.